![]() ![]() ![]() The recuperation of the Aurora mine is ongoing, and the tunnels are expected to be drained within 45 days, following which the Company intends to begin preparing for production. ![]() ![]() So far, the results obtained in the mineralized quartz vein show an average apparent thickness of 0.71 meters and a weighted average grade of 6.27 g/t Au, with values in enrichment zones up to 20.11 g/t Au.The vein’s projected extension is 900 meters. All holes drilled to date have crossed a continuous mineralized zone more than 450 meters in strike, where a quartz vein with sulfides shows a downdip extension of more than 150 meters.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |